Installation
3.12 Trial run
3.12.1 Start-up schedule
Prepare the machine for trial operation by following the INSTRUCTIONS FOR
USE. The instructions describe the measures that must be taken to prepare the
machine for operation.
This should be completed and signed by the customer on start-up.
Machine type:
Machine serial number:
Installation date:
Customer:
Address for visitors:
Postcode + Town/City:
Telephone:
Contact:
Dealer:
Telephone:
Contact:
Installation company:
Telephone:
Contact:
Service company:
Telephone:
Detergent supplier:
Telephone:
End user's signature:
Name in block capitals:
WD-B 500 - WD-B 900
24
Rev. 4.0 (201208)