Installation
3.5 Trial run
3.5.1 Start-up schedule
Read the INSTRUCTIONS FOR USE before preparing the machine for the trial
run. They contain a description of the actions to be taken to prepare the machine
for operation.
This should be completed and signed by the customer on start-up.
Machine type:
Machine number:
Installation date:
Customer:
Address for visitors:
Postcode + Town/City:
Telephone:
Contact:
Dealer:
Telephone:
Contact:
Installation company:
Telephone:
Contact:
Service company:
Telephone:
Detergent supplier:
Telephone:
End user's signature:
Name in block capitals:
Read the contents of the Installation and user manuals carefully. Then check off
as follows:
WD-6C
17
Rev. 3.0 (201305)