Prerequisites
Before installing an air duct, check whether there is any construction waste in the
air shaft. If yes, clear the waste.
Context
Issue 01 (2022-06-30)
Ports for installing air ducts are reserved on the unit. The air ducts need to be
prepared by the customer based on the site requirements. The figures are for
reference only.
Indoor air supply duct: secured by tightening 38 M8x25 screws to a
torque of 15 N·m.
Figure 9-1 Mounting holes
Outdoor air exhaust duct: secured by tightening ST4.8x25 tapping screws
to a torque of 1.5–2.6 N·m and with a recommended screw spacing of
150 mm.
Air duct requirements:
Air duct plates must be at least 1.2 mm thick.
Add a pad at the flange joint between air duct sections. The pad should
be closed-cell foam rubber (thickness: 5 mm) or sealing rubber strip.
Flexible connections are required between the air ducts and the unit.