Huawei FusionCol8000-E260 Quick Manual page 31

Modular indirect evaporative cooling system
Hide thumbs Also See for FusionCol8000-E260:
Table of Contents

Advertisement

FusionCol8000-E260 Modular Indirect Evaporative
Cooling System
Quick Guide (FDC Scenario)
Figure 7-6 Cable routing between the standby DC power supply and the units
Step 4 (Optional) If the continuous cooling feature is configured, install cables between
the lead-acid power control cabinet and the units.
Issue 01 (2022-06-30)
NO TE
For details about how to connect cables between the lithium battery cabinets, see the
SmartLi 3.0 User Manual (Short-Term Backup Power) .
Copyright © Huawei Digital Power Technologies Co., Ltd.
7 Installing Cables
25