FusionCol8000-E260 Modular Indirect Evaporative
Cooling System
Quick Guide (FDC Scenario)
Figure 7-1 Holes on the PDB
(1) Signal cable hole
(4) Standby power cable hole
(L1)
(7) Active power cable hole
(PE)
(10) Standby power cable hole
(PE)
Figure 7-2 Cable route
(1) Active input power cable
(3) Standby DC power cables
(5) Position of the reserved cable terminal in
the indoor unit
Step 2 Route the cables according to the determined cable route.
----End
Issue 01 (2022-06-30)
Copyright © Huawei Digital Power Technologies Co., Ltd.
(2) Standby power cable hole
(L3)
(5) Active power cable hole
(L2)
(8) Active power cable hole
(L1)
(11) Standby DC power cable
hole (DC+)
(2) Signal cable
(4) Standby input power cable
7 Installing Cables
(3) Standby power cable hole
(L2)
(6) Neutral wire hole
(reserved)
(9) Active power cable hole
(L3)
(12) Standby DC power cable
hole (DC–)