Installing The Cable - Huawei DTSU666-H Quick Manual

A/50ma smart power sensor
Hide thumbs Also See for DTSU666-H:
Table of Contents

Advertisement

2
Installing the DTSU666-H and DTSU666-H 250 A/50 mA
1. Install the smart power
sensor on the standard
din rail of DIN35mm
2. Install the Smart Power
Sensor to the standard
din rail from the top to
the bottom, and then
push the instrument to
the din rail from the
bottom to the front
part.
3

Installing the Cable

Prepare cables
Cable
AC power
cable
IA*-13
CT cable
IC*-19
RS485A-24
Comm.
cable
RS485B-25
Port
Type
Ua-3
Four-core
Ub-6
outdoor
copper
Uc-9
cable
Un-10
/
IA-14
/
IB*-16
/
IB-17
/
/
IC-21
/
Two-core
outdoor
shielded
twisted pair
Conductor
Cross-
sectional Area
Range
2
4-6 mm
/
/
/
/
/
/
2
0.25-1 mm
3
Outer
Source
Diameter
10-21
Prepared by
mm
the customer
/
/
/
Manufacturer
/
/
/
4-11 mm
Manufacturer

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DTSU666-H and is the answer not in the manual?

Questions and answers

Table of Contents