Section 5
Installation
RO Membrane
Installation (cont.)
5-6
EASYpure RoDi
5. Fasten membrane in place by stretching the springs around the housing
and hooking them on the tab cutouts in the chassis.
6. Replace the top cover and Ventgard cap, and latch the cartridge access
door closed.
Product
(blue)
Reject
(yellow)
Feed
(green)
Figure 5-6. RO Membrane Installation
Thermo Scientific