Install the Plastic Service Panel on the Access Point
Tip
The best practice is to use one part clear super glue and two parts epoxy to hold the service
panel cover in place. This helps provide some resistance during pressure washing.
Note
When installing the access point flat against a surface in a location that uses ice melt, the best
practice is to apply an anti-seize material to the screws before attaching them to the access
point metal base.
Procedure
1. Attach the plastic service panel base to the access point using four, 75 mm service panel shoulder
screws.
Figure 14: Plastic service panel base views
Callout
1
2
2. Torque the screws to 13 in-lbs.
40
ExtremeWireless™ 802.11ax Wi-Fi 6E Outdoor AP5050D Access Point
Description
Plastic service panel base
Side view of plastic service panel base
Install the Access Point
Need help?
Do you have a question about the ExtremeWireless AP5050D and is the answer not in the manual?
Questions and answers