Project planning with BATCH flexible
9.4
How do I create or edit a batch?
Batch planning
Start batch planning
Edit batches in
planning list
Change processing
sequence, Chain batches
Deletion of batches
for planned but as
yet not released bat-
ches is possible
Block batches /
cancel blocking
Cancel batches
Can only be done in
BOM:
Delete batch
Figure 9-4
How do I create a batch?
9-12
or/and
Insert batch:
(create)
Fill out batch dialog:
Input batch name
Select recipe ,
Assign product/quality,
Input batch quantity
in batch planning:
Input starting date and time,
starting mode,
Batch planning
Batch planned in
planning list
Release
Control recipe generation:
copies the recipe with the exception of the
$ variables and creates a control recipe
for executing the batch.
BOM
Start BOM
Insert batch:
(create)
OK button
BOM
OK
Batch
is released
Further procedure:
see Page 9-13