Siemens SIMATIC PCS7 Manual page 147

Process control system batch flexible, automating batch processes
Hide thumbs Also See for SIMATIC PCS7:
Table of Contents

Advertisement

Batch tree
Batch flexible , Manual
C79000-G7076-C650-02
When the equipment occupancy list is called in batch control, no planned
batches will be displayed.
A selected batch can be processed in exactly the same way as in the batch
planning list (see Chapter 6.3.1). Chaining batches can only be carried out in
batch planning.
The batch tree holds all batches which have allocated apparatuses (in other
words, it is the inverse of the equipment tree) and is called via
'View' ––> 'View batch'.
Batch control
5-11

Advertisement

Table of Contents
loading

Table of Contents