To Replace The Idp-15 Dry Pump Tip Seal - Agilent Technologies 7250 Troubleshooting And Maintenance Manual

Accurate-mass quadrupole time-of-flight gc/ms system
Hide thumbs Also See for 7250:
Table of Contents

Advertisement

6
Vacuum System
Figure 20.

To replace the IDP-15 dry pump tip seal

Materials needed
Procedure
1 Vent the mass spectrometer (see the Agilent 7250 Accurate-Mass Q-TOF
The IDP pump operates at high temperatures. Do not touch any part until you
WAR N IN G
are sure it is cool.
2 Using a 4 mm hex wrench, unscrew the six screws securing the front cowl.
7250 Accurate-Mass Q-TOF Troubleshooting and Maintenance Manual
IDP-15 foreline pump
Gloves, clean, lint-free
Large (8650-0030)
Small (8650-0029)
4 mm hex wrench (8710-2720)
5 mm hex wrench (G4514-80524)
6 mm hex wrench (8710-1839)
IDP-15 tip seal maintenance kit (5190-9613)
GC/MS System Operating Manual).
105

Advertisement

Table of Contents
loading

Table of Contents