3
CI Troubleshooting
If you use argon or other introduced gas to find air leaks, this does not work well
for the reagent gas flow system. It takes as long as 15 minutes for the peak to
reach the ion source if the leak is at the inlet to the flow module.
CI cal
valve
Shutoff
valve
NC
PFDTD
To ion source
Figure 6.
Schematic of CI flow control
Table 4
Flow module valve state diagram
Result
Gas A flow
Gas A
Open
Gas B
Closed
MFCV
On (at setpoint)
Shutoff valve
Open
54
Purge with
Gas B flow
Gas A
Closed
Open
Open
Closed
On (at setpoint)
On (at 100%)
Open
Open
7250 Accurate-Mass Q-TOF Troubleshooting and Maintenance Manual
Flow control module
FC
FT
MFCV
Purge with
Gas B
Closed
Open
On (at 100%)
Open
Gas A
Gas B
Standby,
Pump out
vented, or
flow module
EI mode
Closed
Closed
Closed
Closed
On (at 100%)
Off (at 0%)
Open
Closed