To Install The Idp Pump Ballast - Agilent Technologies 7250 Troubleshooting And Maintenance Manual

Accurate-mass quadrupole time-of-flight gc/ms system
Hide thumbs Also See for 7250:
Table of Contents

Advertisement

6
Vacuum System
The foreline pumps operate at high temperatures. Do not touch any part until
WAR N IN G
you are sure it is cool.
Procedure
1 Unscrew the cap from the exhaust filter.
2 Pull the filter cartridge out of the filter cap.
3 Insert the new filter cartridge.
4 Align the cap onto the filter and twist the cap counter clockwise to lock it in

To install the IDP pump ballast

Materials needed
The IDP pump operates at high temperatures. Do not touch any part until you
WAR N IN G
are sure it is cool.
The MS must be off and vented, and the foreline pump must be off, before
C AU T I O N
performing this procedure.
Procedure
1 Vent the mass spectrometer (see the Agilent 7250 Accurate-Mass Q-TOF
2 Using a 4 mm hex wrench, unscrew the six screws securing the front cowl.
3 Rotate the cowl over the exhaust port.
4 Unplug the fan connector at the base of the cowl, and remove the cowl.
5 Using a 6 mm hex wrench, remove the ballast plug from the desired gas
108
place.
4 mm hex wrench (8710-2720)
6 mm hex wrench (8710-1839)
14 mm wrench
Ballast (Contact Agilent for this part)
GC/MS System Operating Manual).
ballast port.
7250 Accurate-Mass Q-TOF Troubleshooting and Maintenance Manual

Advertisement

Table of Contents
loading

Table of Contents