9.
Install the expansion board.
10. Connect any required internal or external cables to the expansion board.11.
11. Install the access panel.
12. Install the server in the rack.
13. Connect each power cord to the server.14.
14. Connect each power cord to the power source.
15.
Power up the server.
Hitachi Advanced Server HA810 G2 User Guide
83