Install one of the following, as needed:
8.
Expansion boards
Controllers
Install the access panel.
9.
10. Install the server into the rack.
11. Connect each power cord to the server.
12. Connect each power cord to the power source.
13. Power up the server.

Installing an expansion board in the secondary riser cage

Prerequisites
Before installing this option, be sure that you have the following:
The components included with the hardware option kit
T-10 Torx screwdriver
Procedure
1.
Observe the following alerts:
WARNING: To reduce the risk of personal injury from hot surfaces, allow the drives and the internal system components to
cool before touching them.
CAUTION: To prevent damage to electrical components, properly ground the server before beginning any installation
procedure. Improper grounding can cause electrostatic discharge.
2.
Back up all server data.
3.
Power down the server.
Hitachi Advanced Server HA810 G2 User Guide
80

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Advanced Server HA810 G2 and is the answer not in the manual?

Table of Contents