Case CX235C SR Operator's Manual page 234

Crawler excavator
Table of Contents

Advertisement

5. Add oil through the filler hole (1) until the level is cor-
rect.
6. Install the dipstick (2) and the filler plug (1).
7. Wait ten minutes and then use the dipstick (2) to check
the oil level again. If necessary, add more oil through
the filler hole (1).
6 - MAINTENANCE
6-50
4
391AB595

Advertisement

Table of Contents
loading

Table of Contents