Case CX235C SR Operator's Manual page 178

Crawler excavator
Table of Contents

Advertisement

7. (Machine with attachment)
Place the machine completely in front of the trailer so
that the attachment and the dozer blade (if equipped)
rest on the floor of the trailer.
7.
(Machine without attachment)
Place the machine completely in front of the trailer,
rotate the upperstructure then place the dozer blade
(if equipped) on the floor of the trailer.
8.
Stop the engine, remove the ignition key and raise
the function cancellation lever.
9.
Make sure that all doors, hoods and access panels
are correctly locked.
10. Fold the rear view mirrors inwards.
11. Use blocks and chains to fasten the machine and the
attachment (if equipped) to the trailer. See Tie downs
for shipment - Procedure on page 5-6.
12. Measure the distance between the ground and the
highest point of the machine. You must know the
overall height.
5 - TRANSPORT OPERATIONS
5-4
7
UUDO6A-007
8
UUDO6A-008
9
2-0238T
10
UUDO6A-010

Advertisement

Table of Contents
loading

Table of Contents