Troubleshooting The Main Unit; If A Test Fails, Use The Following Procedure To Troubleshoot The Main Unit; Procedure Steps; Testing An Mbm - Nortel Business Communications Manager 450 Installation Manual

Hide thumbs Also See for Business Communications Manager 450:
Table of Contents

Advertisement

98 Troubleshooting
9

Troubleshooting the main unit

If a test fails, use the following procedure to troubleshoot the main unit.

Procedure steps

Step
1
2
3
4
5
6

Testing an MBM

Use the following procedure to test an MBM installed in the main unit or
expansion cabinet.
If you are experiencing an issue with an FEM, ensure all DIP switches are set
to the On position. For more information, see
configuration (page
Procedure steps
Step
1
Copyright © 2006-2009 Nortel Networks
If this system is connected to an expansion cabinet with an MBM that
supports lines, repeat steps 6 to 8 with an extension that can access one of
the lines connected to the expansion unit.
Action
Verify that no nonfunctional features are included in your installed keycode.
Check the wiring to the main unit and to the MBMs. Make sure that the
cables are properly seated and are connected to the correct ports.
Reboot the BCM450 system.
Check the LEDs.
Use Element Manager or the Telset Administration feature to check the
programming for the lines or extensions that failed the call test.
If the programming is incorrect, use the Backup and Restore Utility to load
a recent backup of system programming. If a recent backup is not available,
correct the programming using Element Manager or the Telephone
Administration feature.
47).
Action
Check the Power and Status LEDs on the MBM. Both LEDs must be solid
green. If either LED is not solid green, a problem exists with the MBM.
Nortel Business Communications Manager 450 1.0
Installation — System
NN40160-301 01.04 Standard
July 2009
--End--
--End--
Fiber expansion module

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bcm450

Table of Contents