Verification Before Power-On; Powering On The Router - H3C SR6602-X1 AC Installation Manual

Hide thumbs Also See for SR6602-X1 AC:
  • Faq (22 pages)
Table of Contents

Advertisement

Verification before power-on

Before powering on the router, verify that:
Make sure the power modules and fan tray are correctly installed.
The power cord is properly connected.
The input power voltage meets the requirement of the switch.
The console cable is properly connected, the terminal or PC used for configuration has started,
and the configuration parameters have been set.
If you use a CF card, make sure the CF card is firmly seated in slot.
Make sure the interface modules, if any, are correctly installed.

Powering on the router

Power on the router, and you can see the following information:
System is starting...
Press Ctrl+D to access BASIC-BOOTWARE MENU
Press Ctrl+T to start memory test
Booting Normal Extend BootWare........
****************************************************************************
*
*
*
****************************************************************************
Copyright (c) 2004-2012 Hangzhou H3C Technologies Co., Ltd.
Compiled Date
CPU Type
CPU L1 Cache
CPU Clock Speed
Memory Type
Memory Size
Memory Speed
BootWare Size
Flash Size
Nand Flash size
NVRAM Size
BASIC CPLD Version
EXTEND CPLD Version : 1.0
PCB Version
BootWare Validating...
Press Ctrl+B to enter extended boot menu...
Starting to get the main application file--flash:/SR6602X.bin!
The main application file is self-decompressing.............................
H3C SR66 Routers BootWare, Version 1.12
: Nov 14 2012
: P4080
: 32KB
: 1500MHz
: DDR3 SDRAM
: 4096MB
: 650MHz
: 1024KB
: 8MB
: 512MB
: 128KB
: 1.0
: Ver.A
35
*
*
*

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sr6602-x seriesSr6602-x2 acSr6602-x1 dcSr6602-x2 dc

Table of Contents