Route the wiring to the terminal block.
a.
b.
c.
d.
5.
Route and install the RJ-45 Controller Area Network (CAN) cables between
the UPS cabinets. See Figures
6.
Route and install pull chain wiring (twisted wires 0.5-2.0 mm2) between the
UPS cabinets and cabinet MOBs. See Figures
information.
7.
If you are wiring MiniSlot connections, proceed to Section
8.
Install the power terminal cover right and left sides using the provided
hardware.
Figure 25. UPS paralleling wiring diagram – with parallel tie cabinet
A
Tie cabinet
B
Terminating jumper
C
UPS 1
D
UPS 2
E
UPS 3
©
Eaton Corporation plc 2019. All rights reserved.
Remove the small parts from the knockout in the right side plate.
Route the wiring to the wiring access, see Figure
wiring to the four mounting clips provided using Zip ties.
Reinstall the cover panels.
Install the power terminal cover up and down sides using the provided
hardware.
21
27
and
for wiring information.
22
F
UPS 4
G
Building alarm (BA)
H
Pull chain (PUL CH)
I
Twisted pairs
J
Customer terminal block connections
Revision: 002
Document ID: P-164000848
User's and installation guide
22
. Secure the
27
and
for wiring
5.3.3
.
66 (118)

Advertisement

Table of Contents
loading

This manual is also suitable for:

93e g2 120/12093e g2 200/16093e g2 200/200

Table of Contents