Eaton 93E Generation 2 UPS 100-200 kVA
(380/400/415V)
4.
Route cables from positive (+) and negative (-) terminals in the first battery
into the UPS cabinet through the conduit (back or bottom entry) and
connect the cables to terminals BAT+ and BAT-.
5.
If the external battery cabinet has a control circuit, route control/feedback
wires from the external battery cabinet to the UPS tripping circuit terminals.
93E-100-200kVA units support 24 V OVT functionality.
Size cables according to cable size recommendations in Table
protective device specification in Table
If you are installing more than one battery cabinet, the first battery cabinet will
be the only cabinet directly connected to the UPS.
5.2
Note: Without accessory cabinets, conduit and wiring enter from the bottom or
rear of the UPS conduit landing plate. These accessory cabinets are to be
supplied by the customer.
To install the wiring:
1.
Route the wiring to the UPS terminal blocks in the UPS. See Figure
wiring access information and terminal locations.
2.
Ground the UPS according to local and national electrical wiring codes by
routing and connecting the ground wire to the input ground lug. See Figure
20
for UPS terminal locations. For a detailed view of the UPS ground
terminals, see Figures
3.
Connect phase L1, L2, L3, and neutral rectifier input power wiring from the
utility source to the rectifier input and neutral terminals. See Section
for wiring and termination requirements. For a detailed view of the UPS
terminal block, see Figures
4.
Connect L1, L2, L3, and neutral bypass input power wiring from the utility
source to the bypass input terminals and neutral terminals. For a single
feed installation, jumpers between the input and bypass terminals must be
installed. Mains input N and bypass input N are connected together inside
UPS. See Figure
view of the UPS terminal block, see Figures
5.
Connect phase L1, L2, L3, and neutral (if required) power wiring from
output terminals and neutral terminals to the critical load. See Tables
11
for wiring and termination requirements. For a detailed view of the UPS
terminal block, see Figures
6.
If wiring interface connections, proceed to Section
HIGH TOUCH CURRENT. EARTH CONNECTION ESSENTIAL BEFORE
CONNECTING SUPPLY. As a result of the connected loads, high leakage
©
Eaton Corporation plc 2019. All rights reserved.

External power wiring installation

22
for wiring and termination requirements. For a detailed
12
.
18
19
20
,
and
.
18
19
20
,
and
18
19
20
,
and
WARNING
Revision: 002
Document ID: P-164000848
User's and installation guide
11
, and
.
18
19
20
,
and
.
.
5.3
.
20
for
4.3.2
9
and
57 (118)