Eaton 93E Generation 2 UPS 100-200 kVA
(380/400/415V)
Figure 17. Rolling the cabinet down the ramp
17. To secure the UPS cabinet in
position, lower the leveling feet
until the cabinet is not resting on
the casters and the cabinet is
level.
18. If you are installing the cabinet permanently, reinstall the shipping
brackets to the front and rear of the UPS cabinet to provide extra
support.
Install the shipping brackets with the angle facing outward.
19. Secure the cabinet to the floor with customer-supplied hardware.
©