Eaton 93E Generation 2 UPS 100-200 kVA
(380/400/415V)
3.
In the UPS System Control screen, select the NORMAL → LOAD OFF or
BYPASS → LOAD OFF command, depending on the UPS mode, and press
the
The Verify Action screen is displayed, providing you a choice to proceed or
abort the shutdown.
When the LOAD OFF is confirmed in the following step, all power to the
critical load is lost. Only use this feature when you want to de-energize
the critical load.
4.
Select Yes or No and press the
Selecting Yes immediately shuts down the UPS and de-energizes the
critical load. Selecting No aborts the shutdown.
5.
To restart the UPS after the LOAD OFF, follow the procedure in Section
7.4.1
Power is present inside the UPS cabinet after the upstream input feeder
circuit breakers are opened because of the installed external battery
cabinet.
©
Eaton Corporation plc 2019. All rights reserved.
push button.
7.4.2
or
.
CAUTION
push button.
WARNING
Revision: 002
Document ID: P-164000848
User's and installation guide