Figure 15. Attaching the ramp to the pallet
1
2
11. If the leveling feet are not fully retracted, turn them until they are
retracted.
12. Remove the four bolts securing the rear shipping bracket to the cabinet
and four bolts securing the bracket to the pallet.
13. Remove the rear shipping bracket.
If installing the cabinet permanently, retain the shipping bracket and
securing hardware for later use. Otherwise, recycle the pallet, ramp, and
shipping brackets in a responsible manner.
©