Remove the GPU shelf.
8.
Install the cache module in the SAS cache module connector on the system board. For connector
9.
locations, see "System board components (on page 9)."
Install all components removed from the server.
10.
Install the server into the chassis
11.
Power up the server (on page 14).
12.
Installing the FBWC capacitor pack
WARNING: To reduce the risk of personal injury from hot surfaces, allow the drives and the
internal system components to cool before touching them.
CAUTION: To prevent damage to electrical components, properly ground the server before
beginning any installation procedure. Improper grounding can cause ESD.
Back up all data on the server.
1.
("Installing the server into the
chassis" on page 23).
Hardware options installation 43