Install the riser card into the PCI cage.
10.
If necessary, install the expansion boards
11.
48).
IMPORTANT: The server does not power up if the PCI riser board assembly is not seated
properly.
Connect all internal cabling to the expansion boards.
12.
Install all components removed from the server.
13.
Install the server into the chassis
14.
Power up the server (on page 14).
15.

Redundant hot-plug power supply option

CAUTION: All power supplies installed in the server must have the same output power
capacity. Verify that all power supplies have the same part number and label color. The system
becomes unstable and may shut down when it detects mismatched power supplies.
Label color
Orange
Green
White
Yellow
CAUTION: To prevent improper cooling and thermal damage, do not operate the server
unless all bays are populated with either a component or a blank.
To install the component:
Unfasten the cable management solution to access the power supply bays.
1.
("Installing the server into the
Output
750 W
1,200 W
1,200 W -48Vdc
1,500 W
("Installing an expansion board or
chassis" on page 23).
FlexibleLOM" on page