FlexibleLOM
o
Expansion board
o
Connect all internal or external cabling to the installed board.
12.
Install the GPU cage
13.
Install the SFF hot-plug drive cage.
14.
Install the shipping brackets.
15.
Install the server into the chassis
16.
Connect the peripheral cables.
17.
Power up the server (on page 14).
18.
Installing a PCI riser board assembly
Power down the server (on page 14).
1.
Disconnect all peripheral cables from the server.
2.
Remove the server from the chassis (on page 14).
3.
("Installing the server into the
chassis" on page 23).