INTRODUCTION
!
WARNING
Do not operate, or allow others to operate,
service or repair this equipment unless
you (they) fully understand all applicable
sections of this manual and are qualified
to operate/maintain the equipment.
This boiler is equipped with an ignition
device, which automatically lights the
burner. Do not try to light the burner by
hand.
Prior to the commencement of any work
requiring the removal of cover plates and
the opening of the control panel box, the
electrical supply to the boiler must be
disconnected.
Assure all electrical connections are
powered down prior to attempting
replacement or service of electrical
components or connections of the
equipment.
Label all wires prior to disconnecting when
servicing controls. Wiring errors can cause
improper and dangerous operation.
Operating the equipment beyond
its design limits can damage the
equipment and can also be dangerous.
Do not operate the equipment outside
its limits. Do not try to upgrade the
equipment performance by unapproved
modifications. Unapproved modifications
can cause injury and damage.
Contact your Fulton Representative before
modifying the equipment.
Defective equipment can injure you
or others. Do not operate equipment
which is defective or has missing parts.
Make sure all repairs or maintenance
procedures are completed before using
the equipment. Do not attempt repairs or
any other maintenance work you do not
understand.
Never attempt to operate equipment that
has failed to pass all the safety checks.
Please read these instructions and save for
reference.
1-2

Overview

Prior to shipment, the following inspections and tests are made to ensure
the highest standards of manufacturing for our customers:
ƒ Material inspections
ƒ Manufacturing process inspections
ƒ American Society of Mechanical Engineers (ASME) welding inspection
ƒ ASME hydrostatic test inspection
ƒ Electrical components inspection
ƒ Operating test
ƒ Final engineering inspection
ƒ Crating inspection
This manual is provided as a guide to the correct operation and maintenance
of your Fulton equipment, and should be read in its entirety and be made
permanently available to the staff responsible for the operation of the boiler. It
should not, however, be considered as a complete code of practice, nor should it
replace existing codes or standards which may be applicable. Fulton reserves the
right to change any part of this installation, operation and maintenance manual.
Installation, start-up, and maintenance of this equipment can be hazardous and
requires trained, qualified installers and service personnel. Trained personnel
are responsible for the installation, operation, and maintenance of this
product, and for the safety assurance of installation, operation, and
maintenance processes. Do not install, operate, service or repair any
component of this equipment unless you are qualified and fully understand
all requirements and procedures. Trained personnel refers to those who
have completed Fulton Service School training specific to this product.
When working on this equipment, observe all warnings, cautions, and notes
in literature, on stickers and labels, and any additional safety precautions that
apply. Follow all safety codes and wear appropriate safety protection. Follow all
jurisdictional codes and consult any jurisdictional authorities prior to installation.
SECTION 1
VSRT-IOM-2022-0728
© The Fulton Companies 2022