Start-Up: Installation & Operation Report For Fulton Steam Boilers - FULTON VSRT Series Installation, Operation And Maintenance Manual

Vertical spiral-rib tubeless boiler
Table of Contents

Advertisement

SERVICE DOCUMENTS
NOTE:
TO BE COMPLETED BY INSTALLING CONTRACTOR.
DATE
TECHNICIAN
CUSTOMER
CONTACT NAME
NATIONAL BOARD
FUEL TYPE
SCOPE OF WORK:
INSTALLATION
GENERAL
BOILER LOCATION
BASE OF INCOMBUSTIBLE MATERIAL
ROOM TEMPERATURE
AMBIENT AIR TEMPERATURE OUTSIDE
ROOM PRESSURE NEUTRAL ATMOSPHERIC PRESSURE & VERIFY
ROOM IS VENTED BY NATURAL MEANS (VENTS & CONNECTIONS)
IF MECHANICAL, MEANS OF VENTILATION ARE USED, INTERLOCK PRESENT
BOILER CLEARANCE IS SUITABLE FOR MAINTENANCE
ACCESS IS PROVIDED TO THE TOP OF BOILER & INSPECTION OPENINGS
ELECTRICAL SUPPLY
VOLTAGE TO EQUIPMENT SKID
VOLTAGE SUPPLIED MEETS EQUIPMENT SPECIFICATION
INDIVIDUAL EQUIPMENT IS FUSED PROPERLY
WALL MOUNTED DISCONNECTS PROVIDED AT READY ACCESS
E-STOP AT THE EGRESS TO ROOM
PIPE WORK
PIPE WORK IS OF PROPER MATERIAL
PIPING IS PROPERLY SUPPORTED
SUPPORTS/ANCHORS ALLOW EXPANSION
AMBIENT AIR TEMPERATURE OUTSIDE
FEED WATER PUMP SUCTION/DISCHARGE PIPE WORK MEETS SPECS
BOILER ROOM SAFETY VALVE(S) PIPED TO SAFE LOCATION
INSULATION
ARE APPROPRIATE SURFACES INSULATED? (FEED WATER TANK, DA TANK, HOT LINES?)
5-2
VSRT-IOM-2022-0728
START-UP: INSTALLATION & OPERATION REPORT
FOR FULTON STEAM BOILERS
REPRESENTATIVE
TECHNICIAN COMPANY
CITY, STATE
PHONE NUMBER
MODEL NUMBER
BOILER DE-RATED
SECTION 5
PAGE 1 OF 9
© Fulton Group N.A., 2022