SECTION 2
VSRT-IOM-2022-0728
system. Ensure that all bolts are tightened evenly and
to the torque recommended values provided by the
gasket manufacturer.
8. High point bleeds/air vents are to be installed at all high
points in the system piping.
9. All pipes should be installed with a pitch to facilitate
draining and venting.
(Boilers with a maximum operating pressure of 125 psig, 150 psig max. trim pressure)
Service
Blowoff
Water bottle nipples
Note: downstream of the water bottle drain
valve to follow surface blowdown piping
requirements
Surface Blowdown Piping
Condensate (i.e., any piping that may
come in contact with the condensate that
is not deaerated – water piping).
Feedwater – between the pump and the
boiler/steampac++
Pump Recirculation orifice piping
Steam Headers/Deaerator steam piping to
125 psig incoming steam pressure+++
Overflow/Drain piping (water) including
DA liquid drainer piping
Blowdown tank drain and outlet piping
100% fresh cold water make up (includ-
ing: DA tanks, water softener, etc)
Note: Piping within the boiler's ASME code piping boundary supersedes the information in this table.
++ If there is no preheat in the feedwater tank, feed water piping between the feedwater tank and the boiler should be sch 80, SA 106B.
+++ Welded/flanged pipe (3" and greater) may be sch. 40.
Questions? Please Contact Your Local Manufacturer's Representative
TABLE 7 - SAMPLE PIPING SPECIFICATION
Skid Packaged Steam System Piping Specification
Pipe
Fittings
Sch 80 SA 53A or B or
≤ 2.5" Forged Steel CL3000
SA 106B
≥3" SA 234/SA 105
Sch. 40 SA 53A or B
malleable iron CL 150
or SA 106B
Sch 80 SA 53A or B or
Forged Steel CL 3000
SA 106B
Sch 80 SA 53A or B or
≤ 2.5" Forged Steel CL3000
SA 106B
≥3" SA 234/SA 105
Sch 80 SA 53A or B or
≤ 2.5" malleable iron CL150
SA 106B
≥3" SA 234/SA 105
A length of straight pipe a minimum of 20 pipe diameters directly downstream of the orifice shall
be sch. 80 Stainless Steel pipe and the first elbow shall be an extra heavy Stainless Steel elbow.
Remaining piping to follow the requirements for Deaerator heated piping above.
Sch 80 SA 53A or B or
≤ 2.5" malleable iron CL 150
SA 106B
≥3" SA 234/SA 105
Sch 40 SA 53A or B or
≤ 2.5" malleable iron CL 150
SA 106B
≥3" SA 234/SA 105
Sch 40 SA 53A or B or
malleable iron CL 150
SA 106B
Type L copper
INSTALLATION
Joints
≤ 2.5" Threaded
≥3" welded/flanged 300#
threaded
Threaded
≤ 2.5" Threaded
≥3" welded/flanged 150#
≤ 2.5" Threaded
≥3" welded/flanged 150#
≤ 2.5" Threaded
≥3" welded/flanged 150#
≤ 2.5" Threaded
≥3" welded/flanged 150#
Threaded
2-39