FULTON VSRT Series Installation, Operation And Maintenance Manual page 62

Vertical spiral-rib tubeless boiler
Table of Contents

Advertisement

INSTALLATION
SECTION 2
VSRT-IOM-2022-0728
NOTE:
AIR INTAKE AND EXHAUST TERMINATION SHOULD BE
SEPARATED AS FAR AS POSSIBLE TO PREVENT FLUE GAS
RECIRCULATION DURING DIFFERENT WIND CONDITIONS
MIN 4 FT.
MIN 4 FT. / 122 CM
ABOVE AIR
INTAKE PIPING
IF SNOW ACCUMULATION IS
TYPICAL ROOF PENETRATIONS
SCREENED INLET
APPLICABLE, OPENING TO BE
1 FT. / 30 CM (MIN) ABOVE
(SUGGESTED TERMINATION CONFIGURATIONS)
THE NORMALLY EXPECTED LEVEL
EXHAUST STACK IS DOWNWIND
OF AIR INTAKE OPENING
APPROVED VENT MATERIAL
AIR INLET
EXHAUST OUTLET
FIGURE 32 - ROOF PENETRATION DETAILS FOR VSRT-250
2-52
© Fulton Group N.A., Inc. 2022

Advertisement

Table of Contents
loading

Table of Contents