FULTON VSRT Series Installation, Operation And Maintenance Manual page 60

Vertical spiral-rib tubeless boiler
Table of Contents

Advertisement

INSTALLATION
SCREENED INLET
IF SNOW ACCUMULATION
IS APPLICABLE, OPENING TO BE
1 FT. / 30 CM ( MIN. ) ABOVE
THIS NORMALLY EXPECTED LEVEL.
AIR INLET
2-50
EXHAUST OUTLET
MIN 4FT
( 122 CM )
MIN 4FT / 122 CM
ABOVE AIR
INTAKE PIPING
VSRT
BOILER
( SIDE VIEW )
FIGURE 30 - ROOF PENETRATION DETAILS FOR VSRT 9.5-125 BHP
VSRT-IOM-2022-0728
NOTE:
AIR INTAKE AND EXHAUST TERMINATION SHOULD BE
SEPARATED AS FAR AS POSSIBLE TO PREVENT FLUE GAS
RECIRCULATION DURING DIFFERENT WIND CONDITIONS.
EXHAUST STACK IS DOWNWIND
OF AIR INTAKE OPENING
TYPICAL ROOF PENETRATIONS
( SUGGESTED TERMINATION CONFIGURATIONS )
APPROVED EXHAUST
VENT MATERIAL
NOTE:
1.) When using horizontal runs follow a 1/4" per foot rise to run ratio
2.) Maintain minimum 9" / 22.86 cm air space clearances to combustables,
wires and insulation
3.) Install support straps at 5 FT / 152 CM horizontal intervals and at elbows
SECTION 2
© Fulton Group N.A., Inc. 2022

Advertisement

Table of Contents
loading

Table of Contents