FULTON VSRT Series Installation, Operation And Maintenance Manual page 82

Vertical spiral-rib tubeless boiler
Table of Contents

Advertisement

OPERATION
Parameter
Par. No.
241
Gas: Execution leakage test
0 = no leakage test
1 = leakage test on start up
2 = leakage test on shut down
3 = leakage test on both
242
Gas: Leakage test evacuation time
243
Gas: Leakage test time atm pressure
244
Gas: Leakage test filling time
245
Gas: Leakage test time gas pressure
246
Gas: Waiting time gas shortage
400
Ratio Curves
401
Ratio control curve fuel actuator
402
Ratio control curve air actuator
403
Ratio control curve VSD
500
Ratio Control
501
No-flame positions fuel actuator
Index 0 = no-load position
Index 1 = pre-purge position
Index 2 = post-purge position
502
No-flame positions air actuator
Index 0 = no-load position
Index 1 = pre-purge position
Index 2 = post-purge position
503
No-flame speeds VSD
Index 0 = no-load position
Index 1 = pre-purge position
Index 2 = post-purge position
522
Ramp up
523
Ramp down
542
Activation of VSD / PWM fan
544
Modulation Ramp
545
Lower load limit
546
Upper load limit
600
Actuators
*Data is for reference purposes only. Fulton Companies is not responsible for this product, including (but not limited to) its accuracy, reliability, and safety. No
Fulton document should substitute for full review of documentation available from the product manufacturer.
+Out of Test Fire
Note: Customer settings should be recorded in the Customer column for reference.
3-18
TABLE 8 - STEAM PROGRAM FOR SIEMENS LMV3*
Min Value
Max Value
0
3
0.2 s
10s
0.2 s
60 s
0.2 s
10s
0.2 s
60 s
0.2 s
60 s
0
90
0
90
20 %
100 %
0
90
0
90
0 %
100 %
5 s
20 s
5 s
20 s
0
1
32 s
80 s
20 %
100 %
20 %
100 %
SECTION 3
VSRT-IOM-2022-0728
Fulton Setting
Customer
0
3 s
10 s
3 s
10 s
10 s
0
0
0
0
65
45
0
65 %
65 %
20 s
20 s
1
32 s
20%
100%
© Fulton Group N.A., 2022

Advertisement

Table of Contents
loading

Table of Contents