SECTION 1
VSRT-IOM-2022-0728
!
WARNING
The vent line connection on the
gas pressure regulator must be
piped to outdoor air by the installer
in accordance with the National
Fuel Gas Code, American National
Standards Institute (ANSI) Z2231991
or latest addenda. In Canada, gas
installations must be in accordance
with the current CAN/Compressed
Gas Association (CGA) B149.1 and 2
and/or local codes.
Hot surfaces (over 120 F [49 C])
should be insulated or shielded for
safety. See Installation section.
Use only your hand to turn valve
handles. Never use tools. If the
handle will not turn by hand, don't
try to repair. Forced or attempted
repair may result in fire or explosion.
Should overheating occur or the gas
supply fails to shut off, manually
shut off the gas supply external to
the equipment.
For reasons of safety, the hot
exhaust gas duct and chimney must
be insulated or shielded within the
locality of the heater in compliance
with local codes and regulations.
Check daily that the boiler area is
free and clear of any combustible
materials, including flammable
vapors and liquids.
Do not use matches, candles, flame
or other sources of ignition to check
for gas leaks.
These instructions must not be
considered as a complete code of
practice nor should they replace
existing codes or standards which
may be applicable.
Questions? Please Contact Your Local Manufacturer's Representative
!
WARNING
Commissioning/Start up by a non-
Fulton authorized person will void
the product warranty.
To ensure that your Fulton
equipment is operating safely and
efficiently, follow the maintenance
procedures set forth in this manual.
SAFETY COMPONENTS: The end
user of the boiler must maintain all
labels on the boiler in clean, legible
condition. All connections and
safety devices, both mechanical and
electrical, must be kept clean, with
ease of access for inspection, use
and maintenance.
4
CAUTION
Maintenance procedures for this
equipment should be completed
by trained personnel. Appropriate
training and instruction are available
from the Fulton Service Department
at (315) 298-5121 or your local Fulton
Representative.
When calculating ventilation
requirements, heat losses from
the Fulton equipment (and other
equipment) should be considered.
The stack arrangement and draft
conditions should be in accordance
with the information in this manual
for proper performance of the
equipment.
A competent rigger experienced in
handling heavy equipment should
handle rigging your equipment into
position.
INTRODUCTION
4
CAUTION
Competent personnel in accordance
with all applicable local codes should
carry out the installation of the
Fulton equipment. "Factory-Trained
Personnel" refers to someone who
has attended a Fulton Service School
specifically for the equipment covered
in this manual.
All state and jurisdictional codes
beyond the scope of the applicable
ASME Boiler and Pressure Vessel
Codes, for its corresponding
classification, should be followed in
all cases. Jurisdictional authorities
must be consulted prior to
installation.
The equipment must be installed on a
non-combustible surface.
4
CAUTION
Some soap used for leak testing is
corrosive to certain types of metals.
Clean all piping thoroughly after
completing the leak check.
A temperature exceeding 120°F
(49°C)* in the boiler room may
cause premature failure of electrical
components. Provisions should
be made to maintain an ambient
temperature of 120°F (49°C)*
or less (the panel box interior
should not exceed 125°F [52°C]*).
*Pumps, Programmable Logic
Controllers (PLC) or ModSync
panels may require lower ambient
temperatures or additional
cooling.