Universal Robots UR5 Service Manual page 39

With cb3-controller
Hide thumbs Also See for UR5:
Table of Contents

Advertisement

Replace tool flange and reconnect connectors as illustrated.
Replace tool and reconnect wires correctly.
Gently insert tool flange with screws and washers into the Wrist 3 joint.
Make sure the washers are fully inserted and located on the correct side (this is important) before
gently twisting the tool flange and Wrist 3 joint in opposite directions until a mechanical stop is
met.
Tighten the 8 screws lightly, then tighten in cross order with 1.3Nm.
Slide the grey Teflon ring in place and gently put back the flat ring on top of the Teflon ring.
Mount the grease plug and tighten with 0.8Nm.
All rights reserved
39
Servicemanual_UR5_en_rev3.0.2

Advertisement

Table of Contents
loading

Table of Contents