YASKAWA Solectria PVI 25TL-208 Installation And Operation Manual page 35

Commercial 1000vdc string inverters
Hide thumbs Also See for Solectria PVI 25TL-208:
Table of Contents

Advertisement

Installation and Operation Guide SOLECTRIA® PVI 25TL-208, PVI 50TL-480 and PVI 60TL-480
Heavy Object: The main PVI 25TL-208, PVI 50TL-480, and PVI 60TL-480 inverter section is 123.5 lbs (56 kg).
Please ensure the mounting bracket is properly installed before hanging the inverter on the bracket. It is
recommended to have at least 2 people mount the inverter due to the weight of the equipment.
It is not advisable to leave the Wiring Box Installed without the Power Head:
If it is absolutely necessary to have the Wiring Box installed without the Power Head, keep the bulkhead
connector cover on or reinstall the bulkhead connector cover. The bulk head connector cover is not water tight
so an additional waterproofing method is suggested until the power head is installed.
Remove screws securing the bulkhead connector cover at the top of the wiring box. Tool required: No. 2 Phillips
head screwdriver
DOCR-071030-A (10/7/2022)
Figure 3-11 Grab Handle Position
Install the Wiring Box
CAUTION
NOTICE!
Page 35 of 131

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Solectria pvi 50tl-480Solectria pvi 60tl-480

Table of Contents