YASKAWA Solectria PVI 25TL-208 Installation And Operation Manual page 41

Commercial 1000vdc string inverters
Hide thumbs Also See for Solectria PVI 25TL-208:
Table of Contents

Advertisement

Installation and Operation Guide SOLECTRIA® PVI 25TL-208, PVI 50TL-480 and PVI 60TL-480
To reinstall the cover, replace cover and align the screws. Use a No. 3 Philips head screwdriver to secure the 4
screws on the cover. Torque to 35.4 in-lbs (4 N.m.)
Wiring Box
The conduit knockout locations are show in Figure 3-21. Existing knockout holes can be enlarged by the customer
keeping the center of the knockout in the same location, but no additional or new holes shall be created. If the
knockout holes are enlarged by the customer, adequate room for water tight connections should be taken into
consideration, and all refuse, such as metal shards, shall be removed from within the wire box prior to
commissioning.
5.90in(150.00mm)
① Knockouts for DC input, (3) 1-1/2 inch Trade Size
② Knockout for communication, (2) 3/4 inch Trade Size
③ Knockouts for AC output, (1) 1-1/2 inch Trade Size
DOCR-071030-A (10/7/2022)
Figure 3-20 Removing the Wiring Box Cover
19.29in(490mm)
17.83in(453mm)
16.34in(415mm)
12.05in(306mm)
8.97in(228mm)
DC INPUT
1
4
Figure 3-21 Conduit Knockout Locations on the Wiring Box
0.32in(8mm)
COMM. PORT
2
4.29in(109mm)
AC OUTPUT
3
2.87in(73mm)
2
4.29in(109mm)
3
2.87in(73mm)
Page 41 of 131

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Solectria pvi 50tl-480Solectria pvi 60tl-480

Table of Contents