YASKAWA SOLECTRIA XGI 1000-65/65 Installation And Operation Manual

YASKAWA SOLECTRIA XGI 1000-65/65 Installation And Operation Manual

Commercial 1000vdc string inverter
Hide thumbs Also See for SOLECTRIA XGI 1000-65/65:

Advertisement

Quick Links

Commercial 1000VDC String Inverter
SOLECTRIA XGI™ 1000
Installation and Operation Guide
Models:
XGI 1000-65/65
XGI 1000-60/65
XGI 1000-60/60

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SOLECTRIA XGI 1000-65/65 and is the answer not in the manual?

Questions and answers

Summary of Contents for YASKAWA SOLECTRIA XGI 1000-65/65

  • Page 1 Commercial 1000VDC String Inverter SOLECTRIA XGI™ 1000 Installation and Operation Guide Models: XGI 1000-65/65 XGI 1000-60/65 XGI 1000-60/60...
  • Page 2: Table Of Contents

    Installation and Operation Guide SOLECTRIA XGI 1000 Important Safety Instructions ............................4 Hazard Symbols ............................... 4 Symbols on Labels ..............................5 General Safety Messages ............................6 Status Panel ................................8 Overview ..................................9 Intended Use ................................9 Inverter Features ..............................10 Inverter Protections ..............................
  • Page 3 Installation and Operation Guide SOLECTRIA XGI 1000 Inverter Shutdown ..............................63 Maintenance and Troubleshooting ..........................64 Event Codes ................................64 Servicing the Fans..............................69 WiFi Connection Error ............................70 Specifications ................................71 General Specifications ............................71 Voltage and Frequency Limits and Trip Times ...................... 72 Temperature and Altitude ............................
  • Page 4: Important Safety Instructions

    Installation and Operation Guide SOLECTRIA XGI 1000 Important Safety Instructions Hazard Symbols DANGER Indicates a hazardous situation, which, if not avoided, will result in death or serious injury. WARNING Indicates a hazardous situation, which, if not avoided, could result in death or serious injury. CAUTION Indicates a hazardous situation, which, if not avoided, could result in minor or moderate injury.
  • Page 5: Symbols On Labels

    Installation and Operation Guide SOLECTRIA XGI 1000 Symbols on Labels Table 1-1 Explanation of Symbols on Labels SYMBOL DESCRIPTION DC Signal AC Signal Equipment Ground Phase Refer to Operating Instructions Caution: Risk of Electric Shock Caution: Risk of Electric Shock Timed Discharge DOCR-070733-F (2/22/2021) Page 5 of 78...
  • Page 6: General Safety Messages

    NOTICE ! General Damage to Equipment: Attempting to service the inverter improperly may result in damage. Contact Yaskawa Solectria Solar Technical Support for maintenance.
  • Page 7 Installation and Operation Guide SOLECTRIA XGI 1000 SAVE THESE INSTRUCTIONS This manual contains important instructions for models: XGI 1000-65/65 XGI 1000-60/65 XGI 1000-60/60 DOCR-070733-F (2/22/2021) Page 7 of 78...
  • Page 8: Status Panel

    Installation and Operation Guide SOLECTRIA XGI 1000 Status Panel The Status Panel consists of five LED icons that provide useful information to the user regarding the current state of the inverter. The Status Panel is shown in Figure 1-1 and the icon symbols are defined in Table 1-2. Figure 1-1 Status Panel Table 1-2 Explanation of Symbols on Status Panel SYMBOL...
  • Page 9: Overview

    The SOLECTRIA XGI 1000 is not intended for use in micro-grid or off-grid applications. Although successful integration into AC-couple systems is possible, Yaskawa Solectria Solar does not support or provide guidance for use in this type of application.
  • Page 10: Inverter Features

    Installation and Operation Guide SOLECTRIA XGI 1000 Inverter Features CONVERSION TECHNOLOGY 3 - Level HIGH EFFICIENCY Max 98.2%, CEC 98% GRID ADAPTABILITY Supports multiple grid trip setpoints Adjustable reactive power Adjustable power factor (PF) ±0.85 Remote power curtailment ETHERNET CONNECTIVITY Modbus TCP/IP over Ethernet USER INTERFACE (UI) Wifi UI accessible with smart device...
  • Page 11: Communication Overview

    The SOLECTRIA XGI 1000 is compatible with Solectria’s SolrenView with no additional hardware required. Yaskawa Solectria also supports integration with other third party monitoring platforms. For a complete list of compatible monitoring visit www.solectria.com.
  • Page 12: Labels

    Power Head shows the inverter specifications and FCC compliance, see (Figure 2-7). Figure 2-4 Example Power Head Labels for SOLECTRIA XGI 1000-60/60 (Left) and SOLECTRIA XGI 1000-65/65 (Right) The label on the Wiring Box shows the Model, the order code (C/C), the Enclosure Type, and Serial Number (Figure 2-5).
  • Page 13: Unpacking

    Installation and Operation Guide SOLECTRIA XGI 1000 Unpacking The SOLECTRIA XGI inverter ships in two boxes, the Wiring Box and the Power Head (ordered separately) secured to a pallet. Prior to installation, be sure to store the packaged inverter(s) out of the elements, the inverter enclosures are not NEMA Type 4X rated until fully installed.
  • Page 14 Installation and Operation Guide SOLECTRIA XGI 1000 Mounting Bracket Assembly 1 Mounting Bracket assembly, 3 pieces M5 x 0.8, Nut Mouthing Bracket nut, M5x0.8 SS Nut Shield Front shield, between Power Head and Wire Box Antenna Adapter, WIFI WIFI antenna for GUI Antenna, WIFI 90°...
  • Page 15: Installation

    Installation and Operation Guide SOLECTRIA XGI 1000 Installation Before attempting to install the SOLECTRIA XGI 1000 read Section 3 in its entirety. WARNING Read These Instructions: Failure to follow these installation instructions may result in personal injury or death. Read this section in its entirety before attempting to install a SOLECTRIA XGI 1000.
  • Page 16: Mechanical Installation

    Installation and Operation Guide SOLECTRIA XGI 1000 10. Land the communication conductors. 11. Install conduit foam in all conduit entrances. 12. Replace the plastic shields and the cover of the Wiring Box. Mechanical Installation Inverter Environment The SOLECTRIA XGI 1000 is equipped with a NEMA Type 4X rated, Polyester Powder-Coated Aluminum enclosure suitable for outdoor installation in many different climates.
  • Page 17 Installation and Operation Guide SOLECTRIA XGI 1000 Figure 3-1 Acceptable Inverter Environments (Left to Right): Shaded, Direct Sunlight, and Rain Inverter Mounting Angle and Orientation The SOLECTRIA XGI 1000 must be installed vertically. When possible install inverters under cover or in a north facing orientation.
  • Page 18 Installation and Operation Guide SOLECTRIA XGI 1000 Inverter Dimensions The dimensions of the SOLECTRIA XGI 1000 are shown in Figure 3-3. For a more detailed drawing, visit www.solectria.com to download the Customer Interface Drawing, available as a .pdf or .dwg. Figure 3-3 Inverter Dimensions DOCR-070733-F (2/22/2021) Page 18 of 78...
  • Page 19 Installation and Operation Guide SOLECTRIA XGI 1000 Inverter Spacing It is important to allow ample spacing for ventilation, wire management, and service. The minimum spacing requirements are shown in the following sections for different installation types. Always keep the clearance area (designated with a dashed line) free from debris, plants, and other obstructions.
  • Page 20 Installation and Operation Guide SOLECTRIA XGI 1000 Mounting A mounting bracket is provided with each SOLECTRIA XGI 1000 , shown in Figure 3-5. Direct mounting to any surface without using the provided mounting bracket is not permitted. The mounting bracket must be securely attached to a structurally sound, flat surface.
  • Page 21 Installation and Operation Guide SOLECTRIA XGI 1000 Figure 3-5 Mounting Bracket, mounting holes DOCR-070733-F (2/22/2021) Page 21 of 78...
  • Page 22 Installation and Operation Guide SOLECTRIA XGI 1000 Mechanical Installation, Method Table 3-1 Tools Required TOOL DESCRIPTION 8MM SOCKET 8mm socket 10MM SOCKET 10mm socket 10MM CRESCENT WRENCH 10mm crescent wrench TORQUE WRENCH For use with 8mm and 10mm sockets, capable of 20 in-lbs and 40 in-lbs Assemble and Install Mounting Bracket The Mounting Bracket assembly includes three (3) pieces of sheet metal (A, B, C) and four (4) M5 x 0.8 SS nuts (D), as shown in Figure 3-6.
  • Page 23 Installation and Operation Guide SOLECTRIA XGI 1000 Figure 3-7 Bracket Assembly DOCR-070733-F (2/22/2021) Page 23 of 78...
  • Page 24 Installation and Operation Guide SOLECTRIA XGI 1000 Install Wiring Box NOTICE ! Never Leave Wiring Box Installed without a Power Head: The Wire Box is not designed to be installed without the Power Head. Leaving the Wire Box installed without the powerhead will lead to water ingress, which is not covered under warranty.
  • Page 25 Installation and Operation Guide SOLECTRIA XGI 1000 Figure 3-9 M6 Ground Connection Bolt Install the Power Head CAUTION Lifting Heavy Object Hazard: Proper lifting technique must be used in order to avoid injuries. Use a two-man lift to install the Power Head. NOTICE ! Carefully Align the Power Head with Wire Box: For ease of installation the Power Head and Wire Box are designed with a blind mate connector using a series of guiding brackets and pins.
  • Page 26 Installation and Operation Guide SOLECTRIA XGI 1000 Figure 3-10 M5 Connecting Bolts (Right Side Shown) Install Antenna Attach the antenna to the 90° coaxial antenna adapter, do not over tighten. Connect the antenna assembly to the inverter Power Head, ensure that the antenna remains vertical regardless of the inverter mounting angle. Figure 3-11 Assemble and Install Antenna INFO ✔...
  • Page 27: Electrical Installation Ac

    Installation and Operation Guide SOLECTRIA XGI 1000 Electrical Installation AC The SOLECTRIA XGI 1000 is a 480VAC, 60Hz, 3-phase grid tied inverter with clockwise phase rotation. The inverter will not operate when installed to any other grid voltage or frequency. This section includes important information regarding the AC grid connection, wiring requirements, and installation instructions.
  • Page 28 Using a jumper with then neutral conductor connected may result in damage and void the warranty. AC Conductor Specifications Yaskawa Solectria requires the use of 90°C minimum rated conductors. With longer wire runs, the use of larger conductors than those required by the NEC can help minimize voltage drop and increase system efficiency.
  • Page 29 Installation and Operation Guide SOLECTRIA XGI 1000 Table 3-2 AC Connection Specifications WIRE MATERIAL STANDARD WIRE BOX LARGE AC TERMINAL (-L) WIRE AC OUTPUT (L1, L2, L3) Copper 3 to 1/0 AWG (26.7 to 50 mm 3 to 3/0 AWG (26.7 to 85 mm CONDUCTORS Aluminum 1 to 1/0 AWG (42.4 to 50 mm...
  • Page 30 Installation and Operation Guide SOLECTRIA XGI 1000 Electrical Installation AC, Method DANGER Electric Shock Hazard: Components with hazardous voltage and energy will electrocute operator. Operator shall avoid touching live components with hazardous voltage and energy. Verify the absence of voltage using an appropriately rated multimeter.
  • Page 31 Installation and Operation Guide SOLECTRIA XGI 1000 Remove Wire Box Cover Use a #3 Phillips-head screwdriver to remove the ten (10) screws from the cover of the Wire Box as shown in Figure 3-15. Figure 3-15 Remove Wire Box Cover Screws DOCR-070733-F (2/22/2021) Page 31 of 78...
  • Page 32 Installation and Operation Guide SOLECTRIA XGI 1000 Remove Plastic Safety Shield Remove the DC plastic shield, by loosening four (4) screws with a #2 Phillips-head screwdriver as shown in Figure 3-16. The screws do not need to be completely removed. Slide the plastic cover to the right and remove, set aside in a safe place for reinstallation.
  • Page 33 Installation and Operation Guide SOLECTRIA XGI 1000 INFO ✔ Clockwise Phase Rotation: Ensure the inverter is installed with a clockwise phase rotation. A counterclockwise phase rotation will prevent the inverter from running. If the inverter reports a PLL (Phase Lock Loop) error or the frequency/voltage measurements seem incorrect, check your phase rotation.
  • Page 34: Electrical Installation Dc

    Installation and Operation Guide SOLECTRIA XGI 1000 Electrical Installation DC The SOLECTRIA XGI 1000 provides design flexibility for the installer and designer. The inverter supports a DC/AC ratio of 1.5 and Wire Box options that offer either one or four MPPT zones. It is important to consider the installation type, environmental conditions, PV modules, and string sizing before selecting a Wire Box option.
  • Page 35 Installation and Operation Guide SOLECTRIA XGI 1000 PV String Sizing NOTICE ! DC Overload: Exceeding the recommended DC to AC ratio may damage the inverter and will void the warranty. Size strings according to information in this section and all applicable electrical codes. DC/AC Ratio and Current Limits: Both DC to AC ratio and I limits must be observed.
  • Page 36 Installation and Operation Guide SOLECTRIA XGI 1000 ∑ �� ∗ ��. ���� ≤ ������ (Independent Mode) (3.3) ���� String Mismatch To ensure optimal performance, the number of modules per string should be equal within a given MPPT zone (Independent Mode) or across all zones (Combined Mode). When ordering, select the Wire Box model with the desired operating mode: Independent Mode or Combined Mode.
  • Page 37 Installation and Operation Guide SOLECTRIA XGI 1000 Figure 3-20 Mismatched String Sizes within a Zone or Inverter DC Connection Specifications The voltage rating of the DC conductors must meet or exceed 1000VDC. When connecting to the fuse holders, use copper PV conductors.
  • Page 38 25 and 30 Amp fuses can be purchased separately and installed. Use Littelfuse SPF025 for 25 A fuses and SPF030 for 30 A fuses. Yaskawa Solectria does not supply fuses. When using 30A fuses, never install PV inputs in two adjacent fuse positions.
  • Page 39 Installation and Operation Guide SOLECTRIA XGI 1000 Electrical Installation DC, Method DANGER Electric Shock Hazard: Components with hazardous voltage and energy will electrocute operator. Operator shall avoid touching live components with hazardous voltage and energy. Verify the absence of voltage using an appropriately rated multimeter.
  • Page 40 Installation and Operation Guide SOLECTRIA XGI 1000 Figure 3-22 DC Connections for Single Zone (Fused Connection) DOCR-070733-F (2/22/2021) Page 40 of 78...
  • Page 41: Communication Installation

    The SOLECTRIA XGI inverters utilize an advanced communication platform that can be accessed over WiFi using a smart device, or over Ethernet using a PC. The SOLECTRIA XGI inverters are compatible with Solectria’s SolrenView with no additional hardware required. Yaskawa Solectria Solar also supports integration with other third-party monitoring platforms.
  • Page 42 Installation and Operation Guide SOLECTRIA XGI 1000  The maximum number of inverters in any single daisy chain is 50 inverters.  When using star or mixed network configurations, the maximum number of inverters from one end of a daisy chain to the end of any other daisy chain within a given Cluster must not exceed 50 inverters.
  • Page 43 Installation and Operation Guide SOLECTRIA XGI 1000 Cluster A INV A1, Gateway INV An Inverter Firewall Switch Optional, Long Haul Fiber Modem or Cluster B Internet Gateway Switch or INV B1, Gateway Internet INV Bn Rou ter Inverter Firewall Cluster C INV C1, Gateway INV Bn Inverter...
  • Page 44 Installation and Operation Guide SOLECTRIA XGI 1000 Cluster LAN - All other Ethernet devices - - XGI Inverters Only - Modem or INV 1, Gateway INV 50 INV 49 INV 2 Internet Inverter Gateway Internet Firewall Other Device Other Device Figure 3-26 Networking with Other Devices Monitoring Compatibility The SOLECTRIA XGI is compatible with SolrenView and third-party Data Acquisition Systems (DAS).
  • Page 45 Installation and Operation Guide SOLECTRIA XGI 1000 Static IP Configuration, Gateway Inverter Gateway inverters can be manually configured using a static IP. It is important to identify which Ethernet Port is configured with the static IP and ensure this is connected to the LAN. Once a static IP is configured the port will no longer function as a Cluster connection.
  • Page 46 Installation and Operation Guide SOLECTRIA XGI 1000 with preference given to the specific IP address of the external device (DAS). Up to two IP/Subnet pairs can be entered on each gateway. NOTICE ! CYBER SECURITY! Configuring an entire IP subnet will not only allow the desired DAS device but would also enable all the other devices (authorized or unauthorized) in the subnet to be able to access the Inverter cluster LAN.
  • Page 47 Installation and Operation Guide SOLECTRIA XGI 1000 Port Forwarding, DAS Configuration The External Access IP and respective Port settings must be configured on the third-party monitoring platform or DAS. This will allow the DAS to query the desired inverter properly. Static Routing To implement Static Routing the XGI Gateway Inverter(s) will need to be configured and a static routing rule will need to be added to the LAN.
  • Page 48 Installation and Operation Guide SOLECTRIA XGI 1000 Figure 3-29 Enabling external Modbus access, static routing Static Routing, Entering Static Routing Rule on LAN A static routing rule can be implemented on any permanently installed device on the LAN. Most commonly this is configured on the Internet Gateway Modem/Router or the third-party DAS (if feature is provided).
  • Page 49: Communication And I/O Ports (Xgi-1000 Only)

    Installation and Operation Guide SOLECTRIA XGI 1000 Figure 3-30 Manage IP Configuration Communication and I/O Ports (XGI-1000 Only) The SOLECTRIA XGI has a 16–pin I/O port and two interchangeable Ethernet Ports (see Figure 3-31). These connections are located in the right hand compartment within the Wire Box. Figure 3-31 Communications Connections and Ports: 2 Ethernet Ports (Left) and 16 Pin I/O Port with Connector (Right) DOCR-070733-F (2/22/2021) Page 49 of 78...
  • Page 50: Resealing The Wiring Box

    Installation and Operation Guide SOLECTRIA XGI 1000 Table 3-8 Pin Map for 16 Pin I/O Connector INPUT/ FUNCTION DESCRIPTION/NOTES OUTPUT 1 - 6 Reserved Input Return for remote shutdown 24 VDC signal will shut down and keep inverter in shutdown mode. Input Remote shutdown Opto-isolated means that the control (remote...
  • Page 51 Installation and Operation Guide SOLECTRIA XGI 1000 critical components. The Solectria XGI™ inverter is equipped with a GORE® Vent designed to minimize the risk of condensation. IMPORTANT: After installation and before the inverter is operational the risk of condensation is greatest. To manage moisture during this time it may be necessary to use a desiccant package (not included).
  • Page 52: Startup

    Installation and Operation Guide SOLECTRIA XGI 1000 Startup Mechanical Installation Make sure the mounting bracket is securely installed and all fasteners are tightened to the torque specifications. See Mounting the Inverter. Electrical Connections Make sure all conductors are landed on the correct terminals. Make sure all connections are tightened to torque specifications.
  • Page 53 Installation and Operation Guide SOLECTRIA XGI 1000 Select the gateway node (in blue) at the top of the list. Log in to the inverter (see Inverter Page). Select the “First Time Start Wizard” from the menu under “Inverter Configurations”. Follow the instructions of the “First Time Start Wizard”. 7.
  • Page 54: Graphical User Interface

    Installation and Operation Guide SOLECTRIA XGI 1000 Graphical User Interface The XGI series of inverters operate on an advanced communication platform that provides the operator with an unparalleled level of access and control. The user interface is designed to be intuitive and easy to use, however, it is important to understand the supported network topologies and some XGI specific terminology that is used within this document.
  • Page 55 Installation and Operation Guide SOLECTRIA XGI 1000 The GUI provides the operator a “hands off” means to observe and modify the inverter settings and access all inverters within a Cluster from a single point of connection. Typically when onsite, the preferred means of connection is using a smart phone, tablet, or PC connected over WiFi for ease of use.
  • Page 56 Installation and Operation Guide SOLECTRIA XGI 1000 preferred web browser (example Firefox or Chrome) and type xgi.solar in the address bar, then click Enter to navigate to the website. The laptop should establish a connection with the inverter and display the GUI. Table 6-2 Default Network Credentials WIFI SSID (DEFAULT) PASSWORD (CASE SENSITIVE)
  • Page 57 Installation and Operation Guide SOLECTRIA XGI 1000 Table 6-3 Explanation of Symbols in User Interface Symbol Explanation Inverter OK: This indicates that the inverter is on the Reference List and functioning normally. Inverter Missing: This indicates that the inverter is on the Reference List but is undetected. Inverter Unknown: This indicates that the inverter detected is not on the Reference List.
  • Page 58 Installation and Operation Guide SOLECTRIA XGI 1000 Selecting the inverter status icons will give their current state, as shown in Figure 6-3. Figure 6-3 Current Status with Network and Communication Working and Maintenance with an Event The menu button is located in the upper left corner, represented by three horizontal lines (≡). When clicked, a drop- down menu appears.
  • Page 59 Installation and Operation Guide SOLECTRIA XGI 1000 Many fields have ranges that guide the user to input acceptable data. The Exit button can be used to “escape” or back up to the previous page. The Home button can be used to “escape” or back up to the Home page. Help Many of the pages within the GUI feature a Help section containing important information regarding the particular settings or functions.
  • Page 60: Menu Structure

    Installation and Operation Guide SOLECTRIA XGI 1000 Menu Structure This menu structure is subject to change as firmware updates are released. Inverter List Jump to Other Select Inverter Inverters in to View Cluster Home Live Measurements Inverter Status Inverter Info Charts AC Power DC Voltage...
  • Page 61: Firmware Updates

    SOLECTRIA XGI inverters support local and remote firmware updates. Remote updates are performed automatically from the Yaskawa Solectria Solar server or manually via the Remote Access Portal (with subscription). Local firmware updates can be performed with a laptop and an Ethernet cable.
  • Page 62: Communication Commissioning

    Installation and Operation Guide SOLECTRIA XGI 1000 Figure 7-1 Firmware Update Communication Commissioning Once all inverters are installed and energized, the XGI communications can be commissioned. Before proceeding ensure that the following conditions are met:  All inverters energized, (DC voltage) ...
  • Page 63: Operation

    Installation and Operation Guide SOLECTRIA XGI 1000 INFO ✔ Discovery: When inverters are connected in a Cluster it may take up to 10 minutes for all inverters to discover each other. Startup Wizard Run the Startup Wizard by logging into one of the inverters and selecting Startup Wizard from the main menu. Name the Inverters Enter a name for each inverter on the list.
  • Page 64: Maintenance And Troubleshooting

    Installation and Operation Guide SOLECTRIA XGI 1000 Maintenance and Troubleshooting Event Codes There are three levels of event codes: Critical event, Warning event, and Information event. Critical Events Critical events: the inverter will cease producing AC power and cannot self-recover. This is indicated by the inverter illuminating both the red Power Fault LED (triangle) and the yellow Maintenance LED (wrench).
  • Page 65 Installation and Operation Guide SOLECTRIA XGI 1000 array for an unintentional reference switch the PV array combiners, the PV to ground. panels, or the PV racking system). Immediately contact the installer or another qualified person to locate and repair the source of the ground fault. Ground Fault, A ground fault condition has been DO NOT TOUCH any equipment...
  • Page 66 Installation and Operation Guide SOLECTRIA XGI 1000 AC fuses or breakers. Inspect the AC conductors for damage. If AC voltage is present and the inverter will not grid connect contact Technical Support. Open Phase Detected Open AC phase condition has been Using a CAT III multi-meter verify the detected.
  • Page 67 Installation and Operation Guide SOLECTRIA XGI 1000 Communication 2 Communication processor application Power cycle the inverter. If the Fault fault. inverter does not clear the error, contact Technical Support. Communication 3 Communication processor hardware Power cycle the inverter. If the Fault fault.
  • Page 68 Installation and Operation Guide SOLECTRIA XGI 1000 Information Events Information events will not cause the inverter to cease producing AC power and are provided for reference. There is no LED for these events. Table 10-3 Information Event Codes INFO DISPLAY MESSAGE DESCRIPTION TROUBLESHOOTING EVENT CODE...
  • Page 69: Servicing The Fans

    Installation and Operation Guide SOLECTRIA XGI 1000 Servicing the Fans Three fans are user serviceable. All fans are located and accessible on the sides of the inverter. There are two DC fans accessible on the right side of the inverter underneath the antenna, and one AC fan is accessible on the left side at the bottom of Power Head. The AC and DC fans are different parts and cannot be interchanged.
  • Page 70: Wifi Connection Error

    Installation and Operation Guide SOLECTRIA XGI 1000 DC Fans Align both fans so the fans blow INTO the inverter. The arrow will be pointed into the inverter and the label will not be visible. After servicing the fans, replace the assembly and torque the screw to 20 in-lbs (2.3 N-m). See Figure 10-1 to remove the DC fans.
  • Page 71: Specifications

    Installation and Operation Guide SOLECTRIA XGI 1000 Specifications General Specifications Table 11-1 General Specifications XGI 1000-60/65 XGI 1000-65/65 XGI 1000-60/60 MAX INPUT VOLTAGE 1000 VDC FULL POWER INPUT 580 to 850 VDC 600 to 850 VDC VOLTAGE RANGE OPERATING VOLTAGE 350 –...
  • Page 72: Voltage And Frequency Limits And Trip Times

    Installation and Operation Guide SOLECTRIA XGI 1000 Voltage and Frequency Limits and Trip Times All models of the SOLECTRIA XGI 1000 comply with IEEE1547a-2014 requirements. The tables below show its standard settings. Table 11-2 Default Voltage Limits and Trip Times VOLTAGE RANGE VOLTAGE SETPOINT CLEARING TIME...
  • Page 73 Installation and Operation Guide SOLECTRIA XGI 1000 Figure 11-2 Derating with DC Voltage DOCR-070733-F (2/22/2021) Page 73 of 78...
  • Page 74: Temperature And Altitude

    Installation and Operation Guide SOLECTRIA XGI 1000 Temperature and Altitude Table 11-4 Normal Temperature Ranges XGI 1000-50/60 AND XGI 1000-60/60 XGI 1000-60/65 AND XGI 1000-65/65 AMBIENT TEMPERATURE -40°F to +140°F (-40°C to +60°C) RANGE DERATING TEMPERATURE 122°F (50°C) 113°F (45°C) STORAGE TEMPERATURE -40°F to +167°F (-40°C to +75°C) RANGE...
  • Page 75: Enclosure

    Installation and Operation Guide SOLECTRIA XGI 1000 Enclosure Table 11-5 Enclosure Information ENCLOSURE RATING NEMA TYPE 4 DIMENSIONS 45.8 in x 28.3 in x 11.6 in (1163 x 719 x 295 mm) WEIGHT Power Head: 117 lbs (53.07 kg) Wiring Box: 49 lbs (22.22 kg) Mounting Bracket: 20 lbs (9.07 kg) MOUNTING ANGLE RANGE 5-90°...
  • Page 76: Options

    Installation and Operation Guide SOLECTRIA XGI 1000 Options Wiring Box Configurations The Wire Box comes in several versions. Each version can be ordered in Combined Mode or Independent Mode. Table 12-1 AC Connection Specifications WIRE STANDARD WIRING BOX LARGE AC TERMINAL (-L) WIRING MATERIAL AC OUTPUT (L1, L2, L3) Copper...
  • Page 77 Installation and Operation Guide SOLECTRIA XGI 1000 Large AC Terminal Configuration The Large AC Terminal Wiring Box, as shown in Figure 12-2, is the Standard Wiring Box with larger AC Terminals, allowing for larger AC wires to be used. See Table 12-1 for allowed AC conductor sizes. Figure 12-2 Wiring Box with Large AC Terminal DOCR-070733-F (2/22/2021) Page 77 of 78...
  • Page 78: Appendix

    Installation and Operation Guide SOLECTRIA XGI 1000 Appendix Warranty and RMA Instructions For all warranty information, please visit: http://solectria.com/support/documentation/warranty-information/grid-tied-inverter-warranty-letter/ Datasheet https://solectria.com/support/documentation/inverter-datasheets/xgi-1000-datasheet/ Contact Information Table 13-1 Contact Information TELEPHONE 978.683.9700 978.683.9702 SALES SUPPORT inverters@solectria.com TECHNICAL SUPPORT & 978.683.9700x2 SERVICE WEBSITE www.solectria.com DOCR-070733-F (2/22/2021) Page 78 of 78...

Table of Contents