YASKAWA Solectria PVI 25TL-208 Installation And Operation Manual page 73

Commercial 1000vdc string inverters
Hide thumbs Also See for Solectria PVI 25TL-208:
Table of Contents

Advertisement

Installation and Operation Guide SOLECTRIA® PVI 25TL-208, PVI 50TL-480 and PVI 60TL-480
The main operation interface of LCD screen has 5 menus, i.e.
H
R
D
, and
ISTORY
ECORD
confirm selection. The users can return to the default indication interface by pressing ESC key.
M
EASUREMENT
When the cursor moves to
information as shown in Figure 6-2 . Check the information by pressing UP and DOWN. Return to the previous
menu by pressing ESC.
Setting
DOCR-071030-A (10/7/2022)
I
. The users may select options with
EVICE
NFORMATION
D
ATA
M
EASUREMENT DATA
Main Menu
Measurement Data
Setting
Power On/Off
History Record
Device Information
Figure 6-2 M
M
EASUREMENT
in the main screen, you should press ENT to select the operation
PV Information
PV Input Mode
PdcTotal(kW)
Vdc(V)
Idc(A)
AC Output
V(V)
I(A)
F(Hz)
Pac(Kw)
P Ref
PF Ref
Energy
E-Today(kWh)
E-Month(kWh)
E-Total(kWh)
Others
Heatsink Temp( ℃)
Ambient Temp( ℃)
Grid Connection Rule
Power Derating
D
EASUREMENT
ATA
D
,
S
,
P
ATA
ETTINGS
OWER
and
, and then press ENT to
Independent
0.0
PV2
PV1
PV3
0.0
0.0
0.0
0.0
0.0
0.0
P1/4
L1-N
L2-N
L3-N
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
100.0 %
1.000
P2/4
0.0
0.0
0.0
P3/4
-37.0
-49.9
IEEE1547
P4/4
ON/OFF,
Page 73 of 131

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Solectria pvi 50tl-480Solectria pvi 60tl-480

Table of Contents