Installation and Operation Guide SOLECTRIA® PVI 25TL-208, PVI 50TL-480 and PVI 60TL-480
TOOL
NO. 2 PHILLIPS HEAD SCREWDRIVER
NO. 10 WRENCH
NO. 3 PHILLIPS HEAD SCREWDRIVER
Lifting Heavy Object Hazard: Proper lifting technique must be used in order to avoid injuries. The Power Head
of the Solectria PVI 25TL-208, PVI 50TL-480, AND PVI 60TL-480 weighs 123.5 lbs (56kg).
Hang the inverter on the mounting bracket as shown in Figure 3-10.
Lift mounting: Locate the lifting eyes at the top of the inverter. Use a sling rope or bar (inserted through both
lifting eye nuts) to lift the inverter onto the bracket. The minimum angle between the two sling ropes should be
less than 90 degrees.
Manual mounting: Two people are required to safely lift the inverter by the grab handle positions marked in
Figure 3-11 and mount it onto the bracket.
DOCR-071030-A (10/7/2022)
Mechanical Installation, Method
Table 3-3 Tools Required
Install the Power Head
Figure 3-10 Mount the Main Enclosure on the Bracket by Lifting Sling
DESCRIPTION
Torque value of 1.6 Nm (14.2 in-lbs)
Torque value of 4 Nm (35.4 in-lbs)
Torque value of 4 Nm (35.4 in-lbs)
CAUTION
Page 34 of 131