YASKAWA Solectria PVI 25TL-208 Installation And Operation Manual page 93

Commercial 1000vdc string inverters
Hide thumbs Also See for Solectria PVI 25TL-208:
Table of Contents

Advertisement

Installation and Operation Guide SOLECTRIA® PVI 25TL-208, PVI 50TL-480 and PVI 60TL-480
PERCENTAGE (%)
PFSETVALUE
The
ARC P
submenu is used to enable/disable the ARC function and set the ARC parameters. These
ARAMETERS
settings are only to be changed by Yaskawa Solectria Solar personnel with approval from the AHJ.
Setting
System Parameters
Control Command
Protection Parameters
LVRT/HVRT Setup
Power Derating Setup
Reactive Power Derating Setup
ARC Parameters
The
O
P
THER
ARAMETERS
derating step and GFCI, DCI parameters. Press ENT and use UP/DOWN keys to set parameters and enable/disable
the functions. Press ENT to confirm the setting. The parameters shown in Figure 6-17 and Table 6-11.
DOCR-071030-A (10/7/2022)
4: PF(P)
curve
5: Q(U)
curve
Local
-66.0
Power
Factor
Setting
Local
Power
-1.000
Factor
-0.800
Setting
Arc Parameters
Figure 6-16
Others Parameter
submenu is used to set additional parameters including MPPT scan period, nominal
0.0
66.0
0.800
1.000
1.000
ARC Bandwith Setting
ARCEnable
P1/2
A
P
Submenu
RC
ARAMETERS
0.0
-66.0
-1.000
0.950
-0.800
Disable
P1/1
Page 93 of 131
66.0
0.800
1.000

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Solectria pvi 50tl-480Solectria pvi 60tl-480

Table of Contents