YASKAWA Solectria PVI 25TL-208 Installation And Operation Manual page 40

Commercial 1000vdc string inverters
Hide thumbs Also See for Solectria PVI 25TL-208:
Table of Contents

Advertisement

Installation and Operation Guide SOLECTRIA® PVI 25TL-208, PVI 50TL-480 and PVI 60TL-480
Turn the external AC breaker OFF: Verify the absence of AC voltage prior to terminating any conductors.
Open Fuse Holders: Verify the absence of DC voltage and current.
The SOLECTRIA PVI 25TL-208, PVI 50TL-480, and PVI 60TL-480 3-phase inverters must be installed in accordance
with the National Electric Code, NFPA 70, and any State Codes or local jurisdictions. An online based Solar PV
string sizing tool is available https://solectria.com/support/string-sizing-tool/. This is an optional design tool to
help guide designers by matching the PV panel type and quantity to the inverter's power rating.
Prior to performing any electrical installation, ensure the M6x18 screws (4pcs) installed in Section 3.2.5.5 for
mounting the Inverter onto the Bracket are properly torqued and the area under the bolt-head is clear of paint.
This connection provides an electrical ground bond of the wiring box to the upper/main enclosure.
Removing/Replacing the Wiring Box Cover
Use a No. 3 Philips head screwdriver to remove the 4 screws on the wiring box and remove the cover. (See Figure
3-20)
DOCR-071030-A (10/7/2022)
INFO ✔
WARNING
Figure 3-19 Standard and RSD Wirebox
Page 40 of 131

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Solectria pvi 50tl-480Solectria pvi 60tl-480

Table of Contents