YASKAWA Solectria PVI 25TL-208 Installation And Operation Manual page 119

Commercial 1000vdc string inverters
Hide thumbs Also See for Solectria PVI 25TL-208:
Table of Contents

Advertisement

Installation and Operation Guide SOLECTRIA® PVI 25TL-208, PVI 50TL-480 and PVI 60TL-480
DOCR-071030-A (10/7/2022)
Figure 9-8 Shade Cover Installation; Steps 3 and 5
Install top bracket
as shown.
Nuts M10- 2 pcs.
Torque to 50 in-lbs
(5.6 N.m).
Install bottom bracket
as shown.
Screws M6x16- 4 pcs.
Torque to 25 in-lbs
(2.8 N.m).
Page 119 of 131

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Solectria pvi 50tl-480Solectria pvi 60tl-480

Table of Contents