UPS5000-E-(350 kVA-800 kVA)
User Manual (50 kVA Power Modules)
Figure 3-20 Mounting hole dimensions for the 400 kVA UPS and 500 kVA UPS (unit: mm)
Figure 3-21 Mounting hole dimensions for the 600 kVA UPS (unit: mm)
Step 2 Use a hammer drill to drill holes for installing expansion bolts, and install expansion sleeves
in the holes.
an expansion bolt.
Issue 05 (2018-01-08)
A: mounting holes on the channel steel
B: mounting holes on the floor
Figure 3-22
shows expansion bolt composition.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3 Installation
Figure 3-23
shows how to install
76