HBM GEN Series User Manual page 19

Daq products (data acquisition system)
Hide thumbs Also See for GEN Series:
Table of Contents

Advertisement

Installing the Master/Slave board
To install the Master/Slave board proceed as follows:
1
Shut down the GEN series and remove the power input cable.
2
Ensure that the ejector levers are in the outermost position, tilting away from the board.
3
Slide the board into its guide rails until the ejectors contact the perforated metal strips at
top and bottom.
Figure 2-6: Slide in the board
I2710-1.0 en
19

Advertisement

Table of Contents
loading

Table of Contents