Fujitsu FLASHWAVE 7500 Installation Manual page 343

Table of Contents

Advertisement

21
Connect both ends of cable MA of the power harness as follows:
Identify lug MA in the power harness (see
a.
terminal MAIN A (see
Connect the other end of the same cable to CBP terminal BATT A1 CB2 (see
b.
Figure 5-14 [p.
22
Connect both ends of cable MB of the power harness as follows:
Identify lug MB in the power harness (see
a.
terminal MAIN B (see
Connect the other end of the same cable to CBP terminal BATT B1 CB2
b.
[p.
5-30]).
23
Connect both ends of cable FGND of the power harness as follows:
Identify lug FGND in the power harness (see
a.
shelf terminal FG (see
Connect the other end of the same cable to the equipment rack frame ground.
b.
Replace the plastic cover over the shelf backplane terminal strip.
24
Install Shelf Power Harnesses CB3
25
Refer to the cabling schematic (identified in
shelf to be connected to circuit breaker 3 (CB3)?
If YES:
Go to
Step 26 [p.
If NO:
Go to
Step 35 [p.
Locate the rack/shelf power harness (HA15B-0001-C413,
26
Note: The length of the cables may be altered at the discretion of the installer to ensure proper
length.
FNC-7500-0061-200
Issue 1, May 2009
Revision 1, June 2009
Figure 5-16 [p.
5-30]).
Figure 5-16 [p.
Figure 5-16 [p.
5-32]).
5-39].
5-41].
Fujitsu and Fujitsu Customer Use Only
Extension Configuration
Installing Power, Ground, and Alarm Cables
Figure 5-10 [p.
5-25]) and connect it to shelf
5-32]).
Figure 5-10 [p.
5-25]) and connect it to shelf
5-32]).
Figure 5-10 [p.
5-25]) and connect it to
Step 2 [p.
5-36]) and
Table 5-2 [p.
Figure 5-10 [p.
FLASHWAVE 7500 Release 6.1
CHAPTER 5
(Figure 5-14
5-30]. Is a
5-25]) for the shelf.
5-39
Equipment Installation

Advertisement

Table of Contents
loading

Table of Contents