Fujitsu FLASHWAVE 7500 Installation Manual page 234

Table of Contents

Advertisement

CHAPTER 4
ETSI Configuration
Installing the Rack
Figure 4-7 [p. 4-16]
depending on equipment and location.
88.1 mm
(3.47 in.)
45°
Zone 7
50.8 mm
(2.0 in.)
Zone 5
300 mm
Zone 3
(11.81 in.)
A PWR
4
Using a punch and hammer, mark the position where the holes are to be drilled.
5
Determine the type of floor anchor to be used.
6
Is the floor anchor for a concrete floor?
If YES:
Go to
Step 7 [p.
If NO:
Go to
Step 14 [p.
In accordance with the dimensions of the anchor to be used, drill the holes in the concrete
7
floor.
Clean the drill shavings from the holes.
8
FLASHWAVE 7500 Release 6.1
4-16
Equipment Installation
Revision 1, June 2009
shows an example mounting diagram. Mounting diagrams will vary
40 mm
(1.57 in.)
R 12.7 mm
(R 0.5 in.)
Rectangular Opening
AC PWR
in Center of Rack
Anchor Bolt
Mounting Locations
205.6 mm
(8.09 in.)
Figure 4-7: Example Diagram—Equipment Rack Floor Dimensions
4-16].
4-17].
Fujitsu and Fujitsu Customer Use Only
600 mm
(23.62 in.)
420.8 mm
(16.57 in.)
FGND
Cutout
261.9 mm
(10.31 in.)
Front
185.8 mm
(7.31 in.)
Zone 8
Zone 6
198.7 mm
(7.82 in.)
Zone 4
LAN, signal, fiber, and
power cutout locations
B PWR
typical both sides of rack
FNC-7500-0061-200
Issue 1, May 2009

Advertisement

Table of Contents
loading

Table of Contents