Fujitsu FLASHWAVE 7500 Installation Manual page 192

Table of Contents

Advertisement

CHAPTER 3
Small Configuration
Installing Power, Ground, and Alarm Cables
Install power, ground, and alarm cables for one rack of FLASHWAVE 7500 Small
Configuration equipment as follows:
Identify Cabling Schematic
Step
Task
If you have not already done so, review the reference material presented in
1
Reference Material [p.
In the following list, identify the cabling schematic appropriate for your rack configuration:
2
Rack with one Universal shelf
Rack with two Universal shelves
Rack with three Universal shelves
Disconnect Power from CBP
If installing into a powered rack, disconnect office power (recommended) or remove circuit
3
breakers from the CBP.
Use a DMM to ensure 0 V DC (with reference to the battery ground) at the point of
4
disconnection.
Install Shelf Power Harnesses CB1
Refer to the cabling schematic (identified in
5
identify the shelf that is to be connected to circuit breaker 1 (CB1).
Locate the rack/shelf power harness (HA15B-0001-C413,
6
Note: The length of the cables may be altered at the discretion of the installer to ensure proper
length.
Prepare the power leads by installing the terminal lugs (wrapped in a plastic bag shipped with
7
the cable) that are required on one end of the cable (see
wire strands are shorting terminals together and that leads are securely fastened. The cable
should now have terminal lugs on both ends of the power cable.
Note: The shelf power wiring is the same with all rack configurations. Observe the color coding of the
power cable.
FLASHWAVE 7500 Release 6.1
3-96
Equipment Installation
Revision 1, June 2009
3-84].
(Figure 3-72 [p.
(Figure 3-73 [p.
(Figure 3-74 [p.
Step 2 [p.
Fujitsu and Fujitsu Customer Use Only
Section 3.16.1,
3-87])
3-88])
3-89])
3-96]) and
Table 3-9 [p.
Figure 3-71 [p.
3-86]) for the shelf.
Figure 3-71 [p.
3-86]). Ensure that no
FNC-7500-0061-200
3-90]) to
Issue 1, May 2009

Advertisement

Table of Contents
loading

Table of Contents