Fujitsu FLASHWAVE 7500 Installation Manual page 154

Table of Contents

Advertisement

CHAPTER 3
Small Configuration
Installing the 19-Inch (SFD5) DCM Shelf
Install the SFD5 shelf as follows:
Step
Task
1
Unpack the SFD5 shelf from the shipping container. The DCM units do not need to be
removed from the DCM shelf if they are already installed. The shelf can hold up to two DCM
units.
Is the SFD5 shelf to be installed in a 19-inch relay rack?
2
If YES:
Proceed to
If NO:
Proceed to
Get the flange kit for 19-inch rack mounting.
3
numbers.
FLASHWAVE 7500 Release 6.1
3-58
Equipment Installation
Revision 1, June 2009
Step 3 [p.
3-58].
Step 9 [p.
3-60].
Fujitsu and Fujitsu Customer Use Only
Table 3-5 [p. 3-56]
lists the flange kit part
FNC-7500-0061-200
Issue 1, May 2009