Fujitsu FLASHWAVE 7500 Installation Manual page 241

Table of Contents

Advertisement

10
Repeat
Steps 4 [p. 4-22] through 9 [p.
finally B2 for A1.
11
Connect the frame ground lead to the FG terminal located at the top of the PDP. See
Figure 4-9 [p.
Note: This grounding procedure assumes that the frame ground and power ground are terminated at
a central ground bus (ground window). Refer to Telcordia TR-TSY-000513.
Verify that no strands of wire are shorting terminals together and that leads are securely
12
fastened.
Replace the plastic cover over the input connectors.
13
On the front panel of the PDP, remove fuses A1-1 through B2-2.
14
Observing local procedures, connect each of the power cables to the office batteries and office
15
ground as appropriate.
This procedure is complete.
FNC-7500-0061-200
Issue 1, May 2009
Revision 1, June 2009
4-22], substituting A2 for A1, then B1 for A1, and
4-21].
Fujitsu and Fujitsu Customer Use Only
Connecting and Checking Office Battery to the PDP
FLASHWAVE 7500 Release 6.1
CHAPTER 4
ETSI Configuration
4-23
Equipment Installation

Advertisement

Table of Contents
loading

Table of Contents